Stock photograph: Robotic equipment on an automotive production line

Manufacturing

Know what production needs.See where each job stands.

Connect materials, production progress, quality checks and costs in Frappe ERP, so your team can follow a job from planning to finished goods.

The daily problem

A production plan needs more than a start date.

Materials are in stores, updates are on the floor and costs arrive in finance later. A supervisor needs to know what is missing, which operations are complete and what each run actually used.

Capacity planning reserves workstation time; it does not optimize the schedule. Engineering changes and specialist sequencing need separate assessment. Inspection records are not a validated quality management system.

Follow materials and work through each run.

Bring work orders, stock movements, Job Cards and inspection records together. Review recorded consumption and operation time with finance before closing the job.

Check material readiness

Use BOMs and work orders to plan required materials. Agree how warehouse stock and open purchases count toward demand.

Record material movement

Track issues to production and unused material returned to stores. Planned quantities do not prove actual consumption.

Update job progress

Record completed quantities and operation time in Job Cards. Progress depends on timely updates from the floor.

Keep inspection readings

Record checks against agreed acceptance criteria. Your quality team owns release decisions; blocking rules depend on configuration.

Account for finished output

Record finished goods, process loss and scrap under the rules agreed with production and finance.

Review production cost

Bring material and operation costs into the job review. Custom variance reports and subcontracting scenarios need agreed scope.

Inside Frappe ERP

See the records behind the work.

Follow production through work orders, material entries, Job Cards and quality checks.

Check readiness before production

Bring demand, materials and planned work together. See what you can make and what you still need to buy, with warehouse stock and expected supply considered in the plan.

See where materials stand

This Stock Entry example shows a material receipt. Agree the entry types used for production issues, returns and consumption with stores and finance.

Know how each job is progressing

See completed quantities and operation time against each production job. Give supervisors and the next shift a clear view of progress, with recorded time feeding into job costs.

Keep quality checks with the work

Review inspection readings alongside production work, using agreed acceptance criteria. Give quality leads a shared record of checks and clear responsibility for releasing goods.

Understand the cost of each run

Bring materials used, finished output and operation time together to review production costs. Include unused material, scrap and rework so production and finance can explain the result.

The people doing the work

One set of records. Different responsibilities.

Plant managers

Review readiness and progress before committing a job to the floor.

Production and stores

Record operations, issues and returns against the same work order.

Quality and finance

Review inspection responsibility and explain the materials and time behind each run.

Stock photograph of vehicle bodies and components moving through an automotive assembly plant

Connected modules

Connect production, purchasing and stock.

Review materials, production updates and costing with us. We’ll help your plant team agree what to configure in Frappe ERP.

  • BOM and workstation configuration
  • Items, warehouses and opening WIP
  • Production roles and quality checks
  • Costing and exception rehearsal
  • Operator and supervisor training
Preview style
Find your styleLive site preview
Light sections & panels: #e8f3fcDark section background: #171b24Headings & dark text: #111318Buttons & highlights: #0057ff

Changes stay in this browser. Logos and product screenshots keep their original appearance.

Cobalt & Ice · current palette. Headings: Space Grotesk · current. Body: Space Grotesk · current.